On season 8 episode 7 the tie up is for a rising shed and I am wondering if that is also the tie up for a rising shed. Do I reverse sides and fill in the empty boxes?
On season 8 episode 7 the tie up is for a rising shed and I am wondering if that is also the tie up for a rising shed. Do I reverse sides and fill in the empty boxes?
I meant a different tie up for a sinking shed.😬